The Beavers, a heavy civil construction group, are hosting a tour of the East Link Extension (E335) Light Rail Project in Bellevue, WA. The tour includes a bus ride to Bellevue, project briefing, site tour, lunch, and a bus ride back. The tour focuses on the $295 million project that creates 1.9 miles of the new rail alignment through downtown Bellevue including at-grade track, track within a tunnel, elevated track guideway, retained cut/fill segments, and a major cast-in-place segmental bridge over I-405. The tour will spend time on the elevated track guideway.
What: East Link Extension Light Rail Construction Project Briefing & Tour
When: Friday, October 18th, 7:30AM-2PM
Where: Meet on campus at 7:30AM for a bus ride over to Bellevue (back on campus no later than 2PM).
Food: The Beavers will supply lunch after the tour
Sign up: https://www.signupgenius.com/go/20F0C44ACA72DABFB6-east1
There are 30 spots total available. Please only sign up if you can commit to attending.