ASHRAE Seminar w/Food – Tuesday, November 19 at 5:30pm

Dear Students,

Please join us for the first UW ASHRAE Mechanical Engineering Seminar where Chelsea Guenette will present on the energy and sustainability measures of the Interdisciplinary Engineering Building!

Please register at this link: https://docs.google.com/forms/d/e/1FAIpQLScq-UbQc2dXDW4pt1pnNVEdB2vHj50ibn93g20cfN-pkTCa4g/viewform?usp=sf_link

Date: Tuesday, November 19th
Time: 5:30pm – 6:30pm
Where: MEB 234

About the topic: Did you know that mechanical systems including HVAC account for up to 40% of a building’s total energy use? As part of UW’s Sustainability Plan, UW has required all newly constructed buildings to hit high performance energy standards to hit net-zero energy goals by 2035. Join us for a look at the mechanical systems driving the energy performance of the University of Washington’s new Interdisciplinary Engineering Building, set to achieve LEED Gold certification. This talk will explore the design and integration of key systems, such as the building’s classroom and office air handler units, lab exhaust heat recovery system, and how these contribute to both the building’s efficiency and its LEED certification. The session will also cover how the building’s mechanical systems are integrated with the campus power plant, which is set to have its own upgrades and changes within the coming years.

About the speaker: Chelsea Guenette is a mechanical engineer with over a decade of experience, currently serving as an associate at PAE. She has contributed her expertise to diverse projects, including the UW buildings, laboratories, historic renovations, data centers, and healthcare facilities. Chelsea holds both a Master of Science and a Bachelor of Science in Mechanical Continue reading

Fire Safety and Evacuation Plan (FSEP) – 2024/25 – More Hall

Hello CEE, 

I’ve attached the updated FSEP for More Hall — 

Some highlights: 

  • Mobility-impaired persons may use the main stairwell as an area of refuge. If you or someone you know may have trouble using the stairs, please contact me for an individual evacuation plan. 
  • The More Hall evacuation assembly point is Rainier Vista.In the event of an alarm, please assemble here in order to give emergency responders clear access to operate around the building. 
    • In case of a fire drill this fall, please review the attached FSEP so you are prepared.
  • The FSEP for Wilcox/ Wilson will be shared shortly –  The evacuation assembly points for those occupants is C12 Parking Lot (across Mason Road, south of Wilson Annex)

Please let me know if you have any questions, comments, or concerns.

Thank you,  

Jon Emard

2024_2025 fsep – More Hall

More Hall EAP